Risk Assessment for Bottom Plate Painting Works

 

ONSHORE/OFFSHORE CONSTRUCTION WORKS PROJECT LEVEL II HAZID & RISK ASSESSMENT

 

ITEM

ACTIVITY

HAZARD

RISK RATING
(H, M & L)

CONTROL MEASURES – RISK MANAGEMENT

CONTROLLED RISK RATING

RESPONSIBILITY

1.0 Painting

1.1

General Painting Process
  • Harmful effects on health

H

  • Toolbox talks regarding the harmful effects arising from the painting works will be conducted
  • Correct PPE (in accordance with recommended practices of specific paintwork material, MSDS) will be used.

L

Painting Supervisor

1.2 Preparation of the paint
  • Manual Handling
M
  • Toolbox talk shall be given on manual handling.
  • Manual handling rules to be followed.

L

Painting Supervisor

  • Electrocution (in case electrical paint mixing tool is used)
H
  • All electrical equipment and cables will be checked prior to commencement of the work
  • The cables will be kept in the dry condition

L

Painting Supervisor

1.3

Carrying out the Painting Work

  • Spark and ignition potential of painting materials in the warehouse
  • Fire

H

  • Toolbox talk will be provided on the handling and working with painting materials
  • Painting materials will be stored In hermetically closable containers
  • The storage area will be ventilated, and opening of paint containers will be conducted by means of special accessories
  • Fire extinguisher will be in place.

L

Painting Supervisor

  • Bursting out of the paint hose
  • Injury

M

  • The paint hoses and the equipment will be checked for failures prior to use
  • Whip checks will be mounted on the hoses
  • Proper PPE including goggles will be used

L

Painting Supervisor

  • Inhalation of paint
  • Breathing problems

M

  • Correct use of PPE (respiratory protection)
  • MSDS will be supplied and considered with taking appropriate precautions
  • If the work is carried out in a closed area, adequate ventilation to be provided.
  • Refer to Handling of Flammable Substances Procedure TKF-PRO-HSE-TRG-061 and Handling of Toxic and Harmful Substances Procedure TKF-PRO-HSM-TRG-062

L

Painting Supervisor

  • Contact with the skin and/or eye

H

  • Toolbox talk will provided on the handling and working with painting materials
  • Proper PPE including goggles shall be used.
  • Eye wash station to be available in the workplace.
  • MSDS will be available in the clinic.

L

Painting Supervisor

  • Ignition potential during paint works
  • Fire

H

  • The workplace will be kept free of direct heat sources
  • No smoking will be allowed and appropriate warning signs will be in place
  • Appropriate fire extinguishers will be provided
  • All the painting materials will be placed back to storage area after work

L

Painting Supervisor

  • Electrocution during use of power tools (in case electrical brush is used for removal of the corrosion)

H

  • All electrical equipment and cables will be checked prior to commencement of the work
  • The cables will be kept in the dry condition
  • 110 Volts shall be used for Electrical Hand tools

L

Painting Supervisor

  • Possibility of fall during paint works at height

H

  • Toolbox talk will be provided, paint works at height will be performed using of scaffolding or special cage, safety belts will be used
  • Refer to Working at Heights Procedure TKF-PRO-HSM-TRG-107

L

Painting Supervisor

1.4

Cleaning the equipment

  • Diesel spillage

H

  • The cleaning of the equipment will be conducted in an enclosed area and a drip tray will be used
  • Proper PPE shall be used.

L

Painting Supervisor