ITEM |
ACTIVITY |
HAZARD |
RISK RATING
(H, M & L) |
CONTROL
MEASURES – RISK MANAGEMENT |
CONTROLLED
RISK RATING |
RESPONSIBILITY |
1.0 Painting |
1.1 |
General Painting Process |
- Harmful effects on health
|
H |
- Toolbox talks regarding the harmful effects
arising from the painting works will be conducted
- Correct PPE (in accordance with recommended
practices of specific paintwork material, MSDS) will be used.
|
L |
Painting Supervisor |
1.2 |
Preparation
of the paint |
|
M |
- Toolbox talk shall be given on manual handling.
- Manual handling rules to be followed.
|
L |
Painting Supervisor |
- Electrocution (in case electrical paint mixing tool is used)
|
H |
- All electrical equipment and cables will be
checked prior to commencement of the work
- The cables will be kept in the dry condition
|
L |
Painting Supervisor |
1.3 |
Carrying out the
Painting Work |
- Spark and ignition potential of painting materials in the
warehouse
- Fire
|
H |
- Toolbox talk will be provided on the handling and working with
painting materials
- Painting materials will be stored In hermetically closable
containers
- The storage area will be ventilated, and opening of paint
containers will be conducted by means of special accessories
- Fire extinguisher will be in place.
|
L |
Painting Supervisor |
- Bursting out of the paint hose
- Injury
|
M |
- The paint hoses and the equipment will be checked for failures
prior to use
- Whip checks will be mounted on the hoses
- Proper PPE including goggles will be used
|
L |
Painting Supervisor |
- Inhalation of paint
- Breathing problems
|
M |
- Correct use of PPE (respiratory protection)
- MSDS will be supplied and considered with taking appropriate
precautions
- If the work is carried out in a closed area, adequate
ventilation to be provided.
- Refer to Handling of Flammable Substances Procedure TKF-PRO-HSE-TRG-061
and Handling of Toxic and Harmful Substances Procedure
TKF-PRO-HSM-TRG-062
|
L |
Painting Supervisor |
- Contact with the skin and/or eye
|
H |
- Toolbox talk will provided on the handling and working with
painting materials
- Proper PPE including goggles shall be used.
- Eye wash station to be available in the workplace.
- MSDS will be available in the clinic.
|
L |
Painting Supervisor |
- Ignition potential during paint works
- Fire
|
H |
- The workplace will be kept free of direct heat sources
- No smoking will be allowed and appropriate warning signs will be
in place
- Appropriate fire extinguishers will be provided
- All the painting materials will be placed back to storage area
after work
|
L |
Painting Supervisor |
- Electrocution during use of power tools (in case electrical
brush is used for removal of the corrosion)
|
H |
- All electrical equipment and cables will be checked prior to
commencement of the work
- The cables will be kept in the dry condition
- 110 Volts shall be used for Electrical Hand tools
|
L |
Painting Supervisor |
- Possibility of fall during paint works at height
|
H |
- Toolbox talk will be provided, paint works at height will be
performed using of scaffolding or special cage, safety belts will be
used
- Refer to Working at Heights Procedure TKF-PRO-HSM-TRG-107
|
L |
Painting Supervisor |
1.4 |
Cleaning the equipment |
|
H |
- The cleaning of the equipment will be conducted in an enclosed
area and a drip tray will be used
- Proper PPE shall be used.
|
L |
Painting Supervisor |